In 1981, construction of an 8-mile parallel line from Dover, DE to Canterbury, DE, was completed. Shortly thereafter, in 1982, an interconnect with another upstream supplier, Columbia Gas Transmission (Columbia), was added near Daleville, PA. In 1986, Eastern Shore completed construction of its flagship compressor station at Daleville, PA. The station was constructed to regulate incoming pressures from both interconnecting pipelines.
« Return to Newsroom